The EAF process operation tap-to-tap time is divided into two main sections:
The furnace operator strives to minimize these time periods in order to obtain a higher productivity.
Power-on time can only be reduced by increasing the amount of energy entering the steel phase. This can only be achieved by two principally different means:
Power-off time includes all periods when the furnace is not in operation, i.e. loading, preparations, tapping, maintenance, and can be shortened by a more efficient handling of intermediate tasks.